IMSUGIST.COM
IMSUGIST.COM
Join Us On Facebook Join Us On Twitter Join Us On Instagram
Join Us On Facebook Join Us On Twitter Join Us On Instagram
Have Something Interesting/Informative you want us to Post on Imsugist? Send us an Email To ✉ [email protected]

Work Resumes At The Link Road Construction From IMSU Back-Gate (Photos)

Work have re-commenced at the link road construction from IMSU back gate which was temporarily haulted sometime in May 2018.


The new Link Road connecting from Mbonu ojike (Imsu Back Gate), will link the campus to the new residential NDDC Pro-type hostel. Our investigation have revealed that the scheme is being anchored by the State Government. 


The contract has been awarded and when completed, the road will act as a catalyst for number of significant benefits. Most notably, it will enable the growth and expansion of the campus and provide improved access to the University, Imsu Elijah confirms. 

Work Resumes At The Link Road Construction From IMSU Back-Gate (Photos) Work Resumes At The Link Road Construction From IMSU Back-Gate (Photos) Reviewed by Imsu Elijah on Wednesday, November 28, 2018 Rating: 5

No comments:

Comment And Share Your Thoughts Using The Comment Box Below!

| | | | |


Imsugist.com » All Right Reserved © 2014 - | Created And Powered By Darliweb